General integration

Mall of Africa

Mall of Africa

The musical fountain at dusk, with pink-lit jets and the mall buildings behind under a cloudy sky

Summary

For the new Mall of Africa, the largest mall built in South Africa in one phase, we supplied and installed sound for the centre court and the musical fountain in 2016.

The setting

The Mall of Africa is the largest shopping mall built in South Africa in a single phase. It opened in 2016 with a centre court and a musical fountain.

The challenge

A mall of this size needs sound in open, busy public areas. The centre court and the fountain are two of them.

What we did

In 2016 we supplied and installed audio systems in the centre court and the musical fountain areas.

The outcome

The Mall of Africa's centre court and musical fountain have audio systems supplied and installed by us in 2016.

  • General integration

Talk to a specialist

A specialist reads every enquiry and replies within 2 business days.

Ask SAW

Answers from our website. A specialist is here when you’d like a person.

Ask about our rooms, brands, resellers, projects or support. Please don’t type personal details here: use “Talk to a specialist” for that.